Technical Docs
Set up without noise.
Reference notes for install planning, channel discipline, and field checks before powering a build.
Before Power
- Confirm antenna connection before enabling high output.
- Check input voltage against the hardware label.
- Keep the VTX clear of carbon contact and loose conductive hardware.
Channel Plan
Assign channels before the field day. Separate pilots by band plan and verify output power before launch to avoid avoidable interference.
Kamik-OG